What is BIM?s Degree of Developments (LOD)?
The Level of Development (LOD) framework is a system found in Building Information Modeling (BIM) to define the level of detail and accuracy of information contained inside a BIM model at different stages of a project. The LOD framework offers a common language and understanding among project stakeholders regarding the level of information and model reliability.
You can find different LOD specifications available, however the most commonly used framework may be the LOD Specification developed by the American Institute of Architects (AIA), the Construction Specifications Institute (CSI), and the National Institute of creating Sciences (NIBS). The AIA LOD Specification defines six degrees of development:
LOD 100: Conceptual Design
At this level, the BIM model represents basic massing, volumes, and conceptual design intent. It really is used to convey the entire design concept without specific details or accurate dimensions.
LOD 200: Schematic Design
In this stage, the BIM model provides more descriptive information, including approximate sizes, shapes, and locations of creating elements. It serves as a tool for design development and further analysis.
LOD 300: Design Development
At LOD 300, the BIM model becomes more refined and detailed. It includes specific sizes, shapes, and orientations of building elements. BIM Surveys Coventry incorporates information about systems, assemblies, and connections to aid design development and coordination.
LOD 350: Construction Documentation
As of this level, the BIM model includes accurate and detailed information necessary for construction documentation and coordination. Continue reading incorporates specific products, quantities, and assemblies essential for construction.
LOD 400: Construction Stage
LOD 400 represents the BIM model with as-built information through the construction phase. It offers actual product and material details, precise dimensions, and specific installation methods. It serves as a reference for construction teams.
LOD 500: As-Built Stage
At this final level, the BIM model reflects the specific conditions of the built project. It includes accurate and verified as-built information, such as installed equipment, systems, and components.
It's important to note that the LOD definitions can vary greatly slightly based on the project or organization. The LOD framework helps project stakeholders align their expectations regarding the level of information and detail in a BIM model at different stages of a project. This facilitates effective collaboration, decision-making, and coordination through the entire project lifecycle.